Product Categories

Contact Us

Add:Baoyuan Road, Gushan Town, Weihai City, Shandong Province

Tel:+86-13061180677(whatsapp, wechat)

Fax:+86-631-5925036

E-mail: bsy@baishengyuan.cc

Exhibition

Home > Exhibition > Content
Installation work at the bark peeling machine
Dec 14, 2016

Install log peeler can greatly affect its service life, are also important factors affecting the service life of a, you can scientifically to install it?
1, bark peeling machine after you install the fix, pay attention to the power situation is good, and afterwards to ensure the power is switched on switch box and switch cabinet the 380V power source.
2, the other installation work is complete let after bark peeling machine running empty 3-5 minutes to ensure the operation of machinery without noise or other problems.
3, the installation is complete, log stripping machine operators in the use process must pay attention to safe operation, must not let children or strangers approaching production machinery, so as not to cause harm.